National Christmas Bird Count

THESE BERRIES WERE FOR THE BIRDS.—On Saturday, Stuyvesant Town resident Barbara Bienenfeld spied this robin in a snow-covered bush with berries as she walked into the 14th Street Loop at Avenue A. The photo was taken on Saturday, the day before the National Christmas Bird Count.

On Sunday morning, a local group of birders participated in the national Christmas Bird Count, beginning at Stuyvesant Cove and then moving onto Stuyvesant Town.

Local team members were Pearl Broder, Wendy Byrne, Louise Fraza and Anne Lazarus, who passed along the list of bird species that were spotted, including Sharp-Shinned and Cooper’s Hawks attempting to hunt. “Lots of drama out there,” reported Lazarus, who compiled this list.

Continue reading

Hailing Access-a-Ride will get much easier with app

State Senator Liz Krueger with representatives of the MTA’s Paratransit agency and disability advocates at a forum held last Thursday (Photos by Maria Rocha-Buschel)

By Maria Rocha-Buschel

Access-A-Ride, the method of public transportation relied upon by many disabled New Yorkers, will finally be brought up to speed, thanks to a new app.

Representatives from Paratransit, the branch of the MTA that operates “demand-response” service for customers with disabilities, have announced that the agency will be launching a unified app by next June to improve transparency and provide flexibility in scheduling rides.

Paratransit said this will allow passengers to reserve trips in advance to areas of the city covered by the subway, even if it’s just one hour in advance. The current system, meanwhile, forces users to reserve rides at least 24 hours in advance and with little recourse if rides are delayed or don’t show at all.

Continue reading

Stuy Town bus terminal proposed for L shutdown

MTA graphic depicting proposed mitigation plans during the L train shutdown

By Maria Rocha-Buschel

A new temporary bus terminal may be headed for under the FDR Drive across from Stuyvesant Town and Peter Cooper Village, the MTA and the city have announced. The terminal will act as a transfer point for ferry riders during the 15-month L train shutdown, with more than 60 buses per hour going through the space under the FDR.

The Metropolitan Transportation Authority and Department of Transportation both discussed the plan while testifying at a City Council Transportation Committee hearing last Thursday. During the hearing, they provided information on the proposed terminal and other mitigation plans for the shutdown, including a new, also-temporary ferry route that will end at the planned Stuyvesant Cove ferry stop at East 20th Street and connect with the M14 Select Bus Service (SBS), which is expected to launch in time for the shutdown.

Continue reading