Police Watch: Driver allegedly fled scene of accident, Man charged with office burglary

DRIVER ALLEGEDLY FLED SCENE OF ACCIDENT
Police arrested 33-year-old Raechard White for allegedly leaving the scene of an accident. The victim told police that he was driving east on East 23rd Street with a green light when another vehicle driving north on Park Avenue South went through the red light, striking his vehicle. The victim said that the driver of the vehicle that hit him got out of the car and ran into the subway.

Police were unable to find him at the time, but White had allegedly left a wallet in the vehicle with his name on it and he was arrested inside the 13th Precinct on Tuesday, January 15 at 9 a.m. White was also charged with being an unlicensed operator. Police said that the victim suffered injuries to his ribs and was taken to Bellevue Hospital.

MAN CHARGED WITH OFFICE BURGLARY
Police arrested 20-year-old Jose Gutierrez for alleged burglaries inside 55 West 21st Street last summer. Police said that Gutierrez could be seen on video surveillance after hours while the office was closed for business and was allegedly stealing equipment. Police said that Gutierrez was inside the office on July 18, 2018, and another date later in the month.

Gutierrez was charged with burglary inside the 13th Precinct on Monday, January 14.

Continue reading

Water main break disrupts L train service

Feb26 L Train

By Sabina Mollot

A water main break in Chelsea caused L train service to be disrupted on Wednesday morning as crews worked to stop the flooding.

According to the Department of Environmental Protection, the 20-inch pipe located at Seventh Avenue between 14th and 15th Street burst at around 5:35 a.m. The water was later shut off though, stopping the leak, though not before some flooding in the subway. As of 9:30 a.m., crews were still working to excavate the roadway and repair the main though 14th Street was reopened to traffic.

As of 9:15 a.m., there was still no L train service between Union Square and Eighth Avenue, though otherwise L trains were still running every six minutes, the MTA said.

Still, the agency warned, “Expect delays in both directions” and suggested taking the M14 bus instead.

On its website, the MTA said water had stopped flowing into the tunnel, and crews were still busy clearing water and debris, and inspecting all affected switch and signal equipment. “We are working hard to restore full service by the afternoon rush,” the agency said.

L train updates have been posted online.

Update at 4:30 p.m.: A spokesperson for the DEP says a new valve has been installed and water service restored to 15th Street between 6th and 7th Avenues.  Work continues to repair the main and restore water service to a building on corner of 14th Street and 7th Avenue, which is home to about 450 people. Work was still ongoing to resurface western lanes of Seventh Avenue though they were expected to reopen within the hour.